Home Feedback Search

 
        Perry Park Water and Sanitation District

 

[Under Construction]

Meetings

Meeting Minutes

Forms

Financial Information

CCR 2007

Driving Instructions

Tap Fees & Core Charges

Schedule of Fees and Charges

                          Tap Fees and Core Charges

  Perry Park East Filings 1 and 2

  Perry Park Ranch Filings 1, 2 and 3

  Perry Park Ranch Filings 4, 5 and 6

  Perry Park Ranch Filings 7, 9, 11 and 12

  Sageport Filings 1, 2, 4, 5, 6a, 6b and Bear Dance

 

Summary for All Lots and Tracts:

 

PERRY PARK EAST:

 

WATER TAP FEE                                                                                               $  9,900.00

CORE CHARGE                                                                                                 $  5,500.00

TOTAL CHARGE                                                                                              $ 15,400.00

 

SAGEPORT: (ADD $500.00 IF SERVED BY LIFT STATION AND NOT ASSIGNED A LIFT STATION FEE BY THE SAGEPORT WOODS LID)

 

WATER TAP FEE                                                                                                  $  5,250.00

SEWER TAP FEE                                                                                                  $  6,350.00

WATER CORE CHARGE                                                                                       $  5,500.00

SEWER CORE CHARGE                                                                                       $  2,750.00

TOTAL CHARGE                                                                                                  $19,850.00

 

SAGEPORT #4 & #5 (STERLING POINTE):

 

WATER TAP FEE                                                                                              $ PREPAID

CORE CHARGE                                                                                                    $  8,200.00

 

SAGEPORT LID:

 

WATER TAP FEE                                                                                                  $  5,250.00

SEWER TAP FEE                                                                                                  $  6,350.00

CORE CHARGE                                                                                                    $  1,700.00

WATER AND SEWER STUB FEES                                                                        $  1,400.00

*SEWER ONLY STUB FEE                                                                                    $     700.00

LIFT STATION CHARGES     THRU 1997 (RES.96‑132)                                       $  1,900.00

*The following lots are in the Sageport Filing #2 LID Fee structure:

Block 1 Lots 1‑20, Block 2 Lots 4‑8, Block 2 Lots 12‑19

Block 3 Lots 3‑13, Block 4 Lots 7‑16, Block 9-Lot 1

Block 10 Lots 1‑10 Block 12                Lots 7‑23                 Block 13  Lots 1‑16

Block 14Lots 4‑21                And each of the nine lots in Tract A participating in the LID.

*Lots 2,3,4,5, Block 14 and Lots 10,11, 22, 23, Block 12

 

PERRY PARK RANCH: For lots or tracts, physically located within the Waucondah Wastewater Treatment Plant gravity flow drainage basin (Res. 93‑97, Adopted 6/2/93).

 

WATER TAP FEE                                                                                                  $  5,250.00

SEWER TAP FEE                                                                                                  $  6,350.00

WATER CORE CHARGE                                                                                       $  5,500.00

SEWER CORE CHARGE                                                                                       $  2,750.00

TOTAL CHARGE                                                                                                  $19,850.00*

 

PERRY PARK RANCH: For lots or tracts, physically located outside the Waucondah Wastewater Treatment Plant gravity flow drainage basin and with septic system installed (Res. 93‑97, Adopted 6/2/93).  Larger than 2.5 Acres.

 

WATER TAP FEE                                                                                                  $  9,900.00

WATER CORE CHARGE                                                                                       $  5,500.00

TOTAL CHARGE.                                                                                                 $15,400.00

 

PERRY PARK RANCH: For lots or tracts, physically located outside the Waucondah Wastewater Treatment Plant gravity flow drainage basin and served by a lift station and force main (Res. 93‑97, Adopted 6/2/93).

 

WATER TAP FEE                                                                                                  $  5,250.00

SEWER TAP FEE                                                                                                  $  6,350.00

WATER CORE CHARGE                                                                                       $  5,500.00

SEWER CORE CHARGE                                                                                       $  3,250.00

TOTAL CHARGE                                                                                                  $20,350.00

 

*TORREY PINES/WINGED FOOT COURT STUB FEE (includes Rock Removal)

LOTS 19‑25, BLOCK 1, PERRY PARK #4 AND

LOTS 14‑26, BLOCK 1, PERRY PARK #7                                                            $  3,500.00

 

EFFECTIVE JANUARY 1, 2002 (RESOLUTION 01-142)

NOTE:  These Fees and Charges are Assessed Per

Single Family Equivalent Dwelling Unit

for a 3/4 inch water tap and four inch wastewater line.

For a 1 inch water tap there is an additional $7,500.00 Water Tap Fee.

 

Send mail to ppwsd@comcast.net with questions or comments about this web site.
Last modified: 06/25/08